With 8 months of hard work, a full basement built was achieved with a full ground floor renovation, with added wooden floors and a whole tile floor renovation. Microcement was used on the basement floor level which perfectly matched the exposed steel beams. Bringing a lot of daylight through the crittall doors, skylights and roof glass panels enhanced the whole basement living area.